Our project experience is evident through a variety of rail projects engineered from concept to detail design and commissioning. The following is a summary of recent projects undertaken in a number of different elements of railway signalling.
PROJECTS
Level / Pedestrian Crossings
Metropolitan
- Pakenham Level Crossing Removal Design, 8 Enabling and 3 Major Stages
- Melton Hwy Grade Separation stage 1a, 1b, 2a and 2b (MTM) - Detailed design
- Heyington Dark Territory Removal Project (Alstom) - detail design
- Caulfield to Dandenong: Level Crossing Removal Project (CD9) – (UGL) – Trackside design
- Frauscher Axle Counter implementation – Craigieburn Line (MTM) – Trackside design
- Bayside Rail Project – Frankston Line - upgrade to 25 level crossings, 8 pedestrian crossings and 15 signal upgrades (MTM) – High Level & Trackside design
- Burke Road Enabling Works – signalling design for asset relocation works (ODG)
- Ferguson St, Williamstown North - Pedestrian Crossing Upgrade (VicTrack) – Trackside design
- Blackburn Road Grade Separation Signalling Enabling Works design (AECOM)
- Mitcham/Rooks Grade Separation (JHG) – High Level & Trackside design
- Riversdale Road Tramway Square Rehabilitation and Pedestrian Crossing(s) Upgrade Project (MTM) – High Level & Trackside design
- Lilydale Pedestrian Crossing Upgrade Project (MTM) High Level & Trackside design
- Weston Road, Weston (Newcastle) Level Crossing Project Independent Review
- Kororoit Creek Road Rail Separation Project (MTM) - High Level & Trackside design
- Springvale Rd, Nunawading Road Rail Separation (MTM) - High Level & Trackside design
- Springvale Road, Springvale Road Rail Separation (Alliance) - Trackside design
Regional & Interstate
- Ballarat Line Enabling Works – Design of Level Crossing Widening and Upgrades (LCS)
- Epsom Station Upgrade – Signalling design and Level Crossing upgrade (VicTrack)
- Barossa Way Level Crossing Upgrade Project (SA)
- ARTC Level Crossing Upgrades along the Southern and Western Corridors in NSW
Specifications, Feasibility and Equipment Evaluation
- Technical Review of Alcatel Austria/Thales Australia Signalling Proposal for the trial implementation of ATP Level 1 in Sydney, NSW.
- Preparation of concept documentation for TPWS rollout within the Melbourne Rail Network.
-
Development of signalling technical specifications for Computer Based Interlocking (CBI) upgrades.
- CBI Upgrades at Caulfield, Dandenong, Epping.
- Kensington to Essendon Re-Signalling Project.
- S2 Telemetry System - Newport to Laverton.
-
Development of Technical and Functional Specifications;
- Clifton Hill Rail Project.
- Replacement of Mimic Control Panel at Newport with VDU Signaller’s Workstation.
- Greensborough to Hurstbridge Re-Signalling.
- Feasibility Studies associated with the remote control of Oakleigh from Caulfield and provision of VDU signaller workstations within the Melbourne metropolitan network.
- Preparation of signalling technical specifications associated with Homebush Turnback project, NSW.
- Preparation of signalling functional specification for Lawson CBI signalling project in NSW.
Stabling Facilities
- Maddingley (Bacchus Marsh) Sidings
- East Pakenham Train Maintenance Facility Concept Design for the next generation High Capacity Metropolitan Train.
- Newport South Stabling Project.
- Brighton Beach, Upfield & Upper Ferntree Gully Sidings Project.
- Cobblebank Stabling Yard
- East Pakenham — stabling yard interface
Renewals and Annual Works Plans
- Point Machine Renewals, including in bearer type within the Melbourne metropolitan network.
- Level crossing upgrades including boom mechanism and LED flashing light upgrades.
- Signal Sighting Improvement Works.
- Metropolitan LED Conversions - Design of signal LED conversions throughout the Melbourne metropolitan network.
CBI Data Preparation
- Ballarat Line Upgrade SSI and ElectrologIXS Design
- Microlok Data Preparation for the re-signalling, Bengalla Rail Loop to Sandy Hollow, NSW.
- SI Data Preparation works for Newport.
- SI Data Preparation works for Upfield resignalling.
- SSI Data Preparation works for Sydenham re-signalling project.
Testing and Commissioning
Metropolitan
- Cranbourne Line Upgrade (Major) (WPA)
- Pakenham Stage 2 (Minor enabling) (NWPA)
- Pakenham Stage 3 (Minor enabling) (NWPA)
- Glenroy Stage 2 (Major) (NWPA)
- Pakenham Stage 4 (Minor enabling) (NWPA)
- Preston Stage 2 (Major) (NWPA)
- Pakenham Stage 1A (Major) (NWPA)
- Preston Stage 3 (Major) (NWPA)
- Pakenham Stage 1B (Minor) (NWPA)
- Pakenham Stage 1C (Minor) (NWPA)
- Pakenham Stage 1D (Minor) (NWPA)
- Pakenham Stage 1E (Minor) (NWPA)
- Pakenham Stage 3 (Major) (NWPA)
- Pakenham August ALBF (Minor) (NWPA)
- Pakenham Event 21 (Minor) (NWPA)
- Melton Level Crossing Removal Project — Stage 1 (NWPA)
- Pakenham Stage 5 (Final Arrangement) (NWPA)
- Double Line Block Removal (V/Line)
- Ballarat Line Upgrade – Lendlease/Coleman Alliance
- Trainstop Renewals for both directions of all assets in the Burnley Loop of MURL
- Signal, Trainstop & CSEE Renewals for assets in the Northern Loop of MURL
- CD9 Testing Management, Tester In Charge and function testing for 2017 - mid 2018
- Camberwell Point Machine Renewals (19No.)
- Level Crossing Frauscher Axle Counter implementation – Craigieburn Line
- V/Locity Trap Tracks at 22 crossings on the Pakenham, Craigieburn, Werribee Lines (MTM)
- Frankston Line upgrade to 25 level crossings, 8 ped crossings and 15 signal upgrades (MTM)
- TPWS Upgrade Craigieburn, signaling testing & commissioning (ODG/MTM)
- Burke Road Enabling Works – signaling testing & commissioning (ODG/MTM)
- Ferguson Street, Williamstown North Pedestrian Crossing Upgrade T&C (VicTrack)
- Mitcham/Rooks Road Rail Separation testing & commissioning (JHG/MTM)
- Riversdale Road Tramway Square Rehabilitation and Pedestrian Crossing(s) Upgrade (MTM)
- Lilydale Pedestrian Crossing Upgrade Project, testing & commissioning (MTM)
- Kororoit Creek Road Rail Separation Project, testing & commissioning (MTM)
- Springvale Road, Nunawading Road Rail Separation Project and enabling works, T&C (MTM)
- Dandenong Track Rationalisation Project, testing and commissioning (MTM)
- Glen Waverley Rail Corridor Upgrade Works, testing and commissioning (MTM)
- Newport South Stabling Project, testing & commissioning (MTM)
- Brighton Beach, Upfield & Upper Ferntree Gully Sidings Project, testing & commissioning (MTM) Testing associated with Point Machine Renewals, including in bearer type within the Melbourne metropolitan network.
- Testing associated with Level crossing upgrades including boom mechanism and LED flashing light upgrades.
- Testing associated with Metropolitan LED Conversions throughout the Melbourne metropolitan network.
Regional & Interstate
- Ballarat Line Upgrade Design of enabling works and Final Arrangement Corridor Design
- Murray Basin Level Crossing Upgrade
- Barossa Way Level Crossing Upgrade Project (SA), testing & commissioning
- Regional Rail Link – Work Package C – testing and commissioning works (Alliance)
Audits, Investigations and Asset Condition Monitoring
- Ballarat Line Upgrade correlation (LCS)
- Signalling condition assessment and correlation for Rail Infrastructure Alliance (MMRA)
- Signalling Condition Assessment Cranbourne Pakenham Line Upgrade (CPLU)
- Metropolitan Signalling Asset Audit and Condition Assessment - Throughout the metropolitan railway network (Melbourne).
- South Yarra to Sandringham Verification, Correlation and Upgrade – Field correlation and drafting (to VRIOGS) of signalling plans.
- Metropolitan Signalling Diagrams (32) - Project management, survey and drafting/design quality control for the updating of Victorian signalling diagrams.
- Melbourne Metropolitan Rail Network 25Hz Signalling Power – Investigation and recommendations for the conversion to 50Hz supply.
- UPS & Lightning Protect Upgrade Project fort CBI Locations – assessment and improvement works recommendations.
- CDS Track Monitoring (Dandenong, Hoppers Crossing, St Albans).
- CDS Point Machine Monitoring (Flinders St, North Melbourne, Southern Cross, Franklin St) –over 100.
- Pneumatic Air System Reticulation Monitoring through the inner area.